| The Florida Department of Transportation (FDOT) continues improvements on 71 Street between Bay Drive East and A1A/Collins Avenue on Monday, September 21, 2026. Construction is anticipated to continue through early 2027. Construction activities and lane closures will be implemented during off-peak hours to minimize impacts to residents and businesses. See the map below for the work area. |

Project Scope
Work will involve:
- Upgrading existing crosswalks with high-emphasis pavement markings at all intersections between Bay Drive East and Harding Avenue.
- Upgrading vehicular and pedestrian signals, signs and pavement markings.
- Installing pedestrian curb ramps and new detectable warning surfaces.
- Repaving and restriping to preserve the surface life of the road.
- Installing a new video detection system.
- Upgrading pedestrian signals for Americans with Disabilities Act (ADA) compliance.
Lane Closure Information
Construction hours and do not reflect continuous lane closures. Travel lanes and sidewalks will be closed during non-peak hours on non-event days. Non-peak hours are listed below.
Single Lane Closures:
- 9 a.m. to 3:30 p.m., weekdays and weekends
Double Lane Closures:
- Eastbound: 11 p.m. to 7 a.m., Sunday through Thursday, each night.
- Eastbound: 12 a.m. to 8 a.m., Friday and Saturday nights.
Side Streets Single Lane Closures:
- 9 a.m. to 3:30 p.m., weekdays and weekends.
- 9 p.m. to 6 a.m., weekdays and weekends.
Access to businesses and residences will be maintained throughout the project. Pedestrian and vehicular detours will be established with clear signage.